WALNEY OFFSHORE WIND FARM EXTENSION (WOWO3+4) – PREPARATION FOR CONSTRUCTION – ROCK PROTECTION AT CABLE CROSSINGS
Dear All,
002/17
PREPARATION FOR CONSTRUCTION
SCOUR PROTECTION AT TURBINE POSITIONS – ROCK PROTECTION AT CABLE CROSSINGS
SCOUR PROTECTION AT TURBINE POSITIONS
The bulk Carrier/Rock Placement (Fall Pipe) vessel ‘NORDNES’ is on passage back to the site of THE WALNEY EXTENSION (WOWO3+4) WIND FARM, current position South Minch, and can be expected back on site tomorrow to continue depositing scour protection at selected Turbine positions within the proposed Wind Farm site. (see second attachment).
Walney Ext - Site Boundary
WOWO3+4 Cable Crossings - 'ROCKPIPER'