IN THE AREA JUST OUTSIDE NW CORNER OF THE WEST of DUDDON SANDS WIND FARM
The two FLiDAR BUOYS, each with an associated marker or pendant buoy, and the one WAVE BUOY have now been deployed in the area just outside of the NW corner of the WEST of DUDDON SANDS WIND FARM, opposite the Met Mast and Turbine A01, and will remain in position for a period of approx. two months.
PLEASE MARK THESE POSITIONS ON YOUR CHARTS/PLOTTERS AND KEEP CLEAR
POSITIONS OF FLIDAR BUOYS
FLiDAR 1 : Lat 54° 0′ 3.64″N Long 003° 33′ 36.00″W
FLiDAR 2 : Lat 54° 0′ 10.68″N Long 003° 33′ 37.07″W
(Characteristics of both buoys : Fl (5) Y 20s range 5nm)
Seabed: The mooring system for each floating LIDARs will consist of a U shaped mooring with 2 cast iron sinkers of approx. 4T weights and approx. 80m of mooring chain with various shackles and swivels. Some of the chain will lie on the seabed, the proportion of chain on the seabed will be dependent and drift and tide
Surface: Each buoy will have a surface marker, or Pendant Buoy, denoting the position of the 2nd 4T seabed sinker weight.
POSITIONS OF MARKER OR PENDANT BUOYS
Pendant 1 : Lat 54° 0′ 05.71″N Long 003° 33′ 29.92″W
Pendant 2 : Lat 54° 0′ 14.70″N Long 003° 33′ 35.41″W
(Characteristics of both buoys : Fl (5) Y 20s range 5nm)
…………………………………………………………………………..
POSITION OF WAVE BUOY
Lat 54° 0′ 1.28″N Long 003° 33′ 25.50″W
(Characteristics : Fl (5) Y 20s range 5nm)
Seabed: Mooring: The mooring connection to the buoy is made with a 12mm stainless steel swivel. Ultrahigh molecular weight polyethylene line (UHMWPE) is used for the mooring line and the mooring is anchored to the ground using up to 600kg of heavy chain.
………………………………………………………………………….
The two attachments include chartlets which show in detail the deployment area at the NW corner of the WEST of DUDDON SANDS WIND FARM as well as pictures of the buoys and all of the information relating to their deployment, there are several pages of information on the third attachment.
Also attached for information is the ‘Kingfisher Flyer’ which gives all of the relevant information concerning the WEST of DUDDON SANDS WIND FARM including the Export Cable Routes.
Please note that the ‘Flyers’ are for provided for information purposes relating to the Wind Farm only and should not be used for navigation.
If you know of any fisherman who works the area and does not receive this information or anybody else who would benefit from this information please let me know.
Please do not hesitate to contact me if you require any further information
As part of the intertidal and nearshore works involving the WALNEY EXTENSION (WOWO3+4) EXPORT CABLE LAY two positions of exposed cable are reported on the Middleton Sands.
These positions will be covered at high water
The positions are reported as between the following co-ordinates :
Lat 54″ 00.34N – Long002″ 56.57W to Lat54″ 00.41W – Long002″ 53.97W
Mariners are requested and advised to note these positions and enter them on their charts/plotters and keep clear until notified that all of the nearshore works have completed and all cables are safely buried.
Please do not hesitate to contact me if you are unsure about any of the above or require any further information, also please pass this information to any of your colleagues who you think might be interested.
If you know of any fisherman who works the area and does not receive this information or anybody else who would benefit from this information please let me know.
Attached is a NtM issued by Transmission Capital concerning Diving Operations that are to be carried out at the Offshore Sub-Station at the ORMONDE OFFSHORE WIND FARM
The DIVE PLATFORM/SUPPORT VESSEL will be ‘YORKSHIRE LADY’ and Dive Operations are expected to start on Thursday 18th May and will last for approx. 7 days, depending weather and conditions.
All work will be carried out in the immediate vicinity of the Sub-Station.
‘YORKSHIRE LADY’ will display the ALPHA FLAG (White and Blue) whenever DIVERS are deployed but a minimum 500 meters Safety Exclusion Zone is requested for this vessel at all times when on site.
During Dive Operations the bow of the vessel will be connected to the ORMONDE Sub-Station (or Offshore Platform) by two Poly-Ethelene/Propylene lines of up to 25 m length, anchors at the stern of the vessel will be deployed at approximately 175 m from the vessel in a NE and SE alignment.
Included with the attached NtM is a small chartlet which shows the location of the works in relation to the Wind Farm as well as a picture of ‘YORKSHIRE LADY’
Also attached for information is the ‘Kingfisher Flyer’ which gives all of the relevant information concerning the ORMONDE OFFSHORE WIND FARM
Please note that the ‘Flyer’ is provided for information relating to the Wind Farm only and should not be used for navigation.
Please do not hesitate to contact me if you require any further information
MOD Eskmeals – Activity Alert: 15th to 26th May 2017
Dear Resident,
Detailed below is advance notification of activities which may be noticed in your neighbourhood. All of the limitations and stipulations outlined below apply.
Date
Reason for Notification
15 to 19 May
Firing
22 to 26 May
Firing
I hope that you find this information useful. Please feel free to pass it on to your neighbours.
Yours faithfully,
Penny
Limitations and Stipulations
All activity on the site is conducted in a strictly controlled environment and presents no danger to the public. Please note that the weather, tide times and other operational requirements play a crucial part in trials planning and scheduling. Any one, or a combination of these factors, may mean that the activity has to be cancelled and rescheduled at short notice and it may not be possible to provide you with an updated schedule of work.
The flying of red flags at the range boundary, or the lima flag (yellow and black quartered) at further points, indicates to members of the public that the range is active and there will be firing activities taking place. At those times the byelaws noted on the signs near to the flags are in force. If the red (or lima) flags are not flying, the range is not active and there will be no firing activities undertaken and as such the byelaws are not in force.
Please be aware that QinetiQ carries out work at MOD Eskmeals on behalf of the MOD, under contract with the Secretary of State for Defence. Because of the nature of the work, QinetiQ is limited as to the level and detail of information it can provide in these communications.
QinetiQ operates a free phone care line number, 0800 0150536 for members of the public to call with any queries or concerns.
Please feel free to forward this message on to others who you feel may benefit.
If you do not wish to receive these notifications please reply to this email with a request to unsubscribe.
Yours sincerely
“This information has been generated for the purposes of informing the public as to QinetiQ’s scheduled operations at the MOD Eskmeals Range and it is acknowledged that the information may be included in other websites and publications. Please note that QinetiQ does not accept responsibility for or endorse any independent website or publication which features this information.”
Penny Haworth Community Liaison Officer, ESKMEALS RANGE
Tel: 0800 0150536
email: Eskmealsenquiries@qinetiq.com